We are designing systems of deep cooling of water based on the technology which uses pro-ecologic water solution of lithium bromide as the circulating liquid.
Realisations
| Year | Subject | Localisation | Photos |
|---|---|---|---|
| 2012 | Executive Project of cargo and passenger lift assembly at the level +8,50m at the power unit 4 in ERSA | Rybnik Power Plant | – |
| 2012 | Medium pressure gas pipelines G1 and G2 | Konin Smelter | – |
| 2011 | Water cannons supply system – Main Boiler Building | Opole Power Plant | – |
| 2011 | Adaptation of discharging system BIOMAX in Rybnik Power Plant for a vehicle unloading. | Rybnik Power Plant | gallery |
| 2011 | Assembly of diesel pump for a reserve supply of fire protection system in Rybnik Power Plant. | Rybnik Power Plant | – |
| 2010 | Executive project of modernization of collection and transport system of dry ash from electrofilters in GDF SUEZ Energia Polska S.A. Polaniec. | Polaniec Power Plant | – |
| 2010 | Design idea of biomass feeding system to boilers 5-8, excluding coal pulverizers, in Rybnik Power Plant. | Rybnik Power Plant | – |
| 2010 | Idea of gas engine development in Coking Plant Nowa in Czestochowa. | Coking Plant Nowa Czestochowa | – |
| 2009 | Installation of the use of mine water for a technological purposes in Cement Plant Warta S.A. Design idea. | Cement Plant Warta | gallery |
| 2009 | Executive project of ventilation for the belt conveyors tunel no. T-3a,b and T-1a,b of deslagging system in Rybnik Power Plant. | Rybnik Power Plant | – |
| 2007 | The executive project modernization installation transport of the lime. | Rybnik Power Plant | – |
| 2005 | Project Documentation. Modernization of flue gas desulphurization system in unit 1 in Rybnik Power Plant. | Rybnik Power Plant | – |
| 2004 | Project Documentation. Modernization of flue gas desulphurization system in unit 5 in Rybnik Power Plant. | Rybnik Power Plant | gallery |
| 2004 | Documentation of water conditioning installation in turbine cooling system in Mielec Heat and Power Plant | Mielec Heat and Power Plant | – |
| 2003 | Construction project of Flue Gas Desulphurization at power unit no. 7 with a capacity of 220 MWel at Rybnik Power Plant | Rybnik Power Plant | – |
| 2003 | Project Documentation. Modernization of flue gas desulphurization system in unit 7 with the power of 220MWel in Rybnik Power Plant. | Rybnik Power Plant | – |
| 2003 | Technological documentation of automatic coal sampling installation in Zeran Heat and Power Plant | Zeran Heat and Power Plant | – |
| 2002 | Operating Instruction of power units at Rybnik Power Plant | Rybnik Power Plant | – |
| 2002 | Operating Instruction of district heating at Rybnik Power Plant | Rybnik Power Plant | – |
| 2002 | Basic Project. Adaptation of WW-2 coal tippler in Opole Power Plant | Opole Power Plant | – |
| 2002 | UDT acceptance documentation of transport beams ERSA | Rybnik Power Plant | – |
| 2001 | Power unit exploitation manual in Rybnik Power Plant | Rybnik Power Plant | – |
| 2000 | Inventory and technological scheme of compressed air installation for all machines and fittings in Rybnik Power Plant | Rybnik Power Plant | – |
| 2000 | Installation of a system of volatile ashes industrial usage in Chwałowice Coal Mine | KWK Chwalowice | – |
| 1999 | Constructional and Executive Project. Paint shop, wash and electric engines dryer in Electric Shop section in Rybnik Power Plant | Rybnik Power Plant | – |
| 1999 | Executive Project. System of dosing chemicals to water in flue gas desulphurization system. | Rybnik Power Plant | – |
| 1999 | Coordinating design works concerning the installation of flue gas desulphurization systems in units 1, 5, 6 and 8 (1996-1999) | Rybnik Power Plant | – |
| 1998 | Balance diagram of Flue Gas Desulphurization at power unit no. 1,5,8 (8RT1) | Rybnik Power Plant | – |
| 1998 | Technological basic design of installation for the Lime stone dust production at Rybnik Power Plant | Rybnik Power Plant | – |
| 1998 | Technical project of lances of water injection nozzles at reactor no. 8RT1 for the Flue Gas Desulphurization at power unit no. 9 | Rybnik Power Plant | – |
| 1998 | Proposal of location of unit 1 flue gas desulphurization system in Power Plant Rybnik | Rybnik Power Plant | – |
| 1998 | Basic Technological Project. Installation of lime stone production system in Rybnik Power Plant | Rybnik Power Plant | – |
| 1998 | Feasibility study of Flue Gas Desulphurization in Rybnik Power Plant | Rybnik Power Plant | – |
| 1998 | Lime stone installation in Rybnik Power Plant | Rybnik Power Plant | – |
| 1997 | Feasibility study of gas turbine installation in Rybnik Power Plant | Rybnik Power Plant | – |
| 1997 | Analysis of location possibility and preliminary design of a 370MW gas-steam turbine cooling system in Rybnik Power Plant | Rybnik Power Plant | – |
| 1996 | Analysis of working conditions and corrosive threats of flue blocks after activating flue gas desulphurization system in units 5-8 in Rybnik Power Plant | Rybnik Power Plant | – |
| 1996 | Proposal of location of flue gas desulphurization system in unit 1 in Rybnik Power Plant | Rybnik Power Plant | – |
| 1996 | Proposal of location of flue gas desulphurization system in Siersza Power Plant | Siersza Power Plant | – |
| 1996 | Program and spatial concept of flue gas desulphurization system in unit 1 with the power of 200Mwel and efficiency of 81000Nm3/h | Rybnik Power Plant | – |
| 1996 | Construction and location assumptions concerning the location of flue gas desulphurization system in unit 8 in Rybnik Power Plant | Rybnik Power Plant | – |
| 1995 | Construction and location assumptions concerning the installation of flue gas desulphurization system in unit 5 in Rybnik Power Plant | Rybnik Power Plant | – |
| 1995 | Evaluation of safety of the surface of cooling tower no. 1 in Power Plant Jaworzno III with particular emphasis put on irregular sedimentation and geometric imperfections after making an opening for a pipe with desulphurized gases | Jaworzno Power Plant | – |